Publication:
A Mathematical Model for Line-Seru Conversion and Scheduling Problem in Seru Production System

dc.authorscopusid49561125400
dc.authorscopusid57611596200
dc.authorwosidBeykent(Furugi), Ahad/Aak-9538-2021
dc.contributor.authorFurugi, Ahad
dc.contributor.authorHaliloglu, Melis
dc.contributor.authorIDHaliloğlu, Melis/0000-0003-0687-2451
dc.contributor.authorIDBeykent, Ahad/0000-0001-5875-1446
dc.date.accessioned2025-12-11T01:14:45Z
dc.date.issued2022
dc.departmentOndokuz Mayıs Üniversitesien_US
dc.department-temp[Furugi, Ahad; Haliloglu, Melis] Ondokuz Mayis Univ, Fac Engn, Ind Engn Dept, TR-55139 Samsun, Turkeyen_US
dc.descriptionHaliloğlu, Melis/0000-0003-0687-2451; Beykent, Ahad/0000-0001-5875-1446en_US
dc.description.abstractIn today's competitive environment, businesses need to respond quickly and with high efficiency to the diverse and personal demands of customers in order to increase their competitiveness. In order to increase efficiency and flexibility in production systems, different production systems such as mass production (assembly line) produced by the American Ford company, Toyota Production System (TPS) developed by Toyota in Japan and cellular production system (CM) based on group technology (GT) have been developed. However, productivity is dropped in the assembly line and Toyota production system due to dynamic demands, short life cycle of products and high diversity. Japanese companies such as Sony and Canon have developed a Japanese cellular manufacturing system to meet market demands and to distinguish it from the traditional CM, they have called this production system a seru production system. There have been few studies in the literature on the seru production system. Especially in the Turkish literature, there are only two studies that considered seru production systems. With this aspect, this study is aimed to fill this gap in the literature. In this study, a comprehensive literature review has been conducted. In addition, a mathematical model is proposed for the conversion of the assembly line to the seru production system (line-seru conversion) and scheduling problems that minimize total tardiness. The GAMS package program is used to solve the model and the results are analyzed.en_US
dc.description.woscitationindexScience Citation Index Expanded
dc.identifier.doi10.17341/gazimmfd.884293
dc.identifier.endpage1223en_US
dc.identifier.issn1300-1884
dc.identifier.issn1304-4915
dc.identifier.issue3en_US
dc.identifier.scopus2-s2.0-85128723048
dc.identifier.scopusqualityQ3
dc.identifier.startpage1213en_US
dc.identifier.trdizinid508628
dc.identifier.urihttps://doi.org/10.17341/gazimmfd.884293
dc.identifier.urihttps://search.trdizin.gov.tr/en/yayin/detay/508628/seru-uretim-sisteminde-hat-seru-donusumu-ve-cizelgeleme-problemi-icin-matematiksel-model-onerisi
dc.identifier.urihttps://hdl.handle.net/20.500.12712/42305
dc.identifier.volume37en_US
dc.identifier.wosWOS:000834843300007
dc.identifier.wosqualityQ3
dc.language.isoenen_US
dc.publisherGazi Univ, Fac Engineering Architectureen_US
dc.relation.ispartofJournal of the Faculty of Engineering and Architecture of Gazi Universityen_US
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanıen_US
dc.rightsinfo:eu-repo/semantics/openAccessen_US
dc.subjectSeru Production Systemen_US
dc.subjectLine-Seru Conversion Problemen_US
dc.subjectSchedulingen_US
dc.subjectMathematical Programmingen_US
dc.titleA Mathematical Model for Line-Seru Conversion and Scheduling Problem in Seru Production Systemen_US
dc.typeArticleen_US
dspace.entity.typePublication

Files