Publication:
As-Built Assessment Survey Workflow - Problems and Challenges

Loading...
Thumbnail Image

Date

Journal Title

Journal ISSN

Volume Title

Research Projects

Organizational Units

Journal Issue

Abstract

The purpose of this paper is to present the range of surveying works carried out during geodetic as-built inventory of buildings and utility infrastructure. The theoretical part of this essay complies grounds for legal basis on territory of Poland, which are core part of geodetic and cartographic studies. Moreover, the phases of geodetic as-built inventory are being discussed, in the light of applicable rules. Particular attention is being paid to the topic of situational and height measurements. The paper discusses methods of measurement used, precision groups and objects subjected to inventory measurement are being listed. The practical part of this paper regards surveying as-built inventory of single-family house. In this study we discuss the consequential procedures that contractors need to fallow during the construction process, this includes preliminary actions, field work, and individual elaboration of the findings. Post-completion documentation, gathered in the form of technical frame, after obtaining a positive verification test result was included in the Head Office of Geodesy and Cartography.

Description

Citation

WoS Q

Scopus Q

Q3

Source

Geodetski List

Volume

76

Issue

2

Start Page

121

End Page

134

Endorsement

Review

Supplemented By

Referenced By